Kamali Tuul-5 drillcore
General info
Name | Kamali Tuul-5 drillcore |
Boxes | 7 |
Box numbers | 3-9 |
Repository | TalTech Särghaua |
Storage | h3 (GIT) |
Driller | OÜ Inseneribüroo STEIGER |
Drilling year | 2022 |
Meters in box | 4 |
Institution | Department of Geology, TalTech |
Date added | 2022-04-04 |
Date changed | 2022-06-14 |
Locality
Locality |
Kamali Tuul-5 borehole
|
Country | Estonia |
Coordinates | 58.205874, 25.134718 |
Elevation | 54.40 |
Box 3
Start (m) | 3.8 |
End (m) | 10.2 |
Strat. top |
Aruküla Stage
|
Strat. base |
Aruküla Stage
|
Box 4
Start (m) | 10.2 |
End (m) | 13.75 |
Strat. top |
Aruküla Stage
|
Strat. base |
Aruküla Stage
|
Box 5
Start (m) | 13.75 |
End (m) | 17.65 |
Strat. top |
Aruküla Stage
|
Strat. base |
Aruküla Stage
|
Box 6
Start (m) | 17.65 |
End (m) | 21.7 |
Strat. top |
Aruküla Stage
|
Strat. base |
Aruküla Stage
|
Remarks | run 3 label is wrong, should be from 17.25 to 18.75 |
Box 7
Start (m) | 21.7 |
End (m) | 25.6 |
Strat. top |
Aruküla Stage
|
Strat. base |
Aruküla Stage
|
Box 8
Start (m) | 25.6 |
End (m) | 29.55 |
Strat. top |
Aruküla Stage
|
Strat. base |
Aruküla Stage
|
Box 9
Start (m) | 29.55 |
End (m) | 30.75 |
Strat. top |
Aruküla Stage
|
Strat. base |
Aruküla Stage
|
Browse Geocollections